Description:
|
The City of Winston-Salem is currently widening Meadowlark Drive from Country Club Road to the current widened segment near Robinhood Road to alleviate existing traffic congestion resulting from the additional residential development that has taken place over the last decade and the pending status of the Northern Beltway, which would divert north-south traffic. This project includes grading; installation of curb & gutter, sidewalk, and erosion control measures; the installation and/or replacement of drainage pipe and structures; utility adjustments; milling and paving. This project is more than 50% complete and the selected firm is expected to begin work as soon as contracts can be executed. The tentative completion date is January 2025. The selected firm will be expected to provide inspection services including holding construction meetings, performing contract administration, inspection, coordinating materials sampling and testing, documentation of pay quantities and claims avoidance. Material testing is not part of this contract, another firm is currently providing this service.
|
Publication Date/Time:
|
12/28/2023 1:00 PM
|
Closing Date/Time:
|
1/24/2024 4:00 AM
|
Contact Person:
|
Robert Prestwood, P.E., City Engineer
City of Winston-Salem
Engineering Division
P.O. Box 2511
Winston-Salem, NC 27102
robertp@cityofws.org
|
Related Documents:
|
|
|