North Carolina Bids > Bid Detail
Jackson Library Addition and Renovation Commissioning
Agency: | North Carolina State University |
---|---|
Level of Government: | State & Local |
Category: |
|
Opps ID: | NBD15500189403609499 |
Posted Date: | Apr 20, 2023 |
Due Date: | May 19, 2023 |
Source: | https://www.northcarolina.edu/... |
Institution | UNC Greensboro | |||||
Institution URL for Additional
Information about this Project (Optional) |
https://facdc.uncg.edu/wp-content/uploads/20230420_Jackson-Library-Addition-and-Renovation_Cx-Services-Advertisement.pdf | |||||
Project Name | Jackson Library Addition and Renovation Commissioning | |||||
Type of Services | Commissioning | |||||
Project Manager | T. O. (Buddy) Hale | |||||
Phone Number | (336) 334-4431 | |||||
Contact Email | tohale@uncg.edu | |||||
Closing Date | 05/19/2023 | |||||
Project Budget |
|
|||||
Project Description |
One-Two Sentences
The scope of this project will consist of a comprehensive, transformative renovation to the existing building. The Jackson Library opened in 1950, with the tower addition coming online in 1973, and minimally updated since. The current facility is not reflective of the evolving definition of a modern-day library: a dynamic, technology-rich learning environment and intellectual community hub. Growth in enrollment, new academic programs and library support activities have generated a need for an increase in programmatic space and make it critical that the existing spaces be renovated. The renovation will include updating the existing mechanical, electrical, plumbing, life safety and audiovisual systems. The project also includes addressing ADA issues. Located at the bustling hub that is the physical center of campus, the project is envisioned as a complex, phased construction of an occupied building. As such, implementation will require meticulous and proactive planning. The project will integrate high technology group studies, central convening spaces and increased capacity for use by individual students. It is envisioned as a nexus of student academic success and transformative research resources. The library is considered at the core of the University's intellectual space, where learning, knowledge creation, and community are fostered. Building Commissioning shall include the whole building, and specifically may include the following systems: A. Mechanical Systems - including applicable HVAC Systems, local central plant cooling systems, and Testing, Adjusting, and Balancing (TAB) validation. B. Electrical Systems - including applicable lighting systems, normal, standby, and emergency power systems, and controls, including day lighting. C. Plumbing Systems - including applicable potable hot water systems, booster pump systems, and rainwater harvesting water systems. D. Irrigation Systems - including applicable coverage and controls. E. Building Envelope - Including air barriers, transition and opening details, waterproofing, and roofing systems. F. Evaluation of LEED Silver certification. Letters of Interest due by 12:00 p.m. (noon) on 5/19/23
|
|||||
Submit Letters of Interest
and Current SF-330 to: |
(Contact Person, Name of Institution & Address)
T. O. (Buddy) Hale UNCG Facilities Design and Construction Gray Home Management House 105 Gray Drive, Greensboro, NC 27412 PO Box 26170, Greensboro, NC 27402-6170
|
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.